Monthly Archives: October 2019
We had some important items looked after for Ballymack’s fall maintenance: Heavy Duty Shaft brush installed on drive shaft and attached to divers dream zinc. Bow thruster blades replaced Zinc in bowthruster tunnel relocated to new dedicated divers dream zinc on stbd side, just aft and below bowthruster tunnel. Seized thruhull replaced with new bronze one. New bottom paint ( 2 coats) Finished installation of the electronic chain counter with dedicated outside… Read More